One job, start to finish
Cedar Ridge Medical Office
Plans in. Preliminary quote out.
8Fixture types
206Fixtures counted
Nov 12Bid due
1 Intake
The job lands, and it's set up.
CustomerNorthline Builders
Dana Price, Preconstruction
LocationCedar Ridge, Springfield
Two-story medical office, 24,000 sq ft
Bid dueNov 12, 2:00 PM
Job walk Nov 5
Plan setPermit set, Oct 14
18 electrical sheets, E-001 to E-501
ScopeFixtures and controls
Interior, site lighting, occupancy controls
PackageAs specified + alternate
Alternate on troffers and downlights
Electrical set, permit, Oct 14
Bid invite
Addendum 1
DWG requested
2 Takeoff
Every fixture counted, with its source.
| Type | Fixture | Qty | Source | Check |
|---|---|---|---|---|
| A | 2x4 LED troffer, 4000K | 86 | Plan tags, E-201 to E-203 | Matches schedule |
| B | 2x2 LED troffer, 4000K | 24 | Plan tags, E-201 | Matches schedule |
| C | 6 in LED downlight | 42 | Fixture symbols, E-201 to E-202 | Matches circuit watts |
| D | 4 ft linear pendant | 14 | Plan tags, E-202 | Plan 14, schedule 12 |
| X | LED exit sign | 18 | Plan tags, all floors | Matches schedule |
| EM | LED emergency unit | 10 | Plan tags, all floors | Matches schedule |
| S1 | LED area light, Type III | 6 | Photometric schedule, E-501 | Matches site plan |
| W1 | LED wall pack, full cutoff | 6 | Plan tags, E-501 | Matches schedule |
Takeoff reviewCount sheet
3 Configurator
As specified on every line. An alternate where it pays.
ASpecified: Maker One basket trofferAlternate: Maker Two center basketAlternate picked
| As specified | Alternate | |
|---|---|---|
| Size | 2x4 | 2x4 |
| Lumens | 4,800 | 5,400 (field selectable down to 4,500) |
| Color | 4000K, 80 CRI | 3500 / 4000 / 5000K selectable, 80 CRI |
| Watts | 39 | 38 |
| Dimming | 0-10V to 1% | 0-10V to 10% |
| Look | Square smooth lens | Curved lens |
Two things to confirm: curved lens instead of square, and dimming to 10% instead of 1%.
Specified cut sheetAlternate cut sheet
BSpecified: Maker One basket troffer, 2x2Alternate: Maker Two center basket, 2x2Alternate picked
| As specified | Alternate | |
|---|---|---|
| Size | 2x2 | 2x2 |
| Lumens | 4,000 | 3,950 at the middle setting |
| Color | 4000K, 80 CRI | Selectable, ships 4000K |
| Watts | 31 | 30 |
CSpecified: Maker Three 6 in downlightAlternate: Maker Four 6 in downlightNeeds a look
| As specified | Alternate | |
|---|---|---|
| Aperture | 6 in, round | 6 in, round |
| Lumens | 1,500 | 1,500 |
| Trim | Clear semi-specular | Clear specular |
Trim finish differs. Worth a sample before the submittal.
DSpecified: Maker Five linear pendantAs specifiedKept as specified
Design-intent fixture. No alternate offered.
X, EM, S1, W1Exit, emergency and siteAs specifiedKept as specified
Carried the same on both proposals.
4 Quote
Two proposals, in the template your team already uses.
Proposal 1
As specified
8 lines, plus controls. Priced so the customer sees exactly what was drawn.
- Quantities approved by the team
- Pricing in from the quotes team
Proposal 2
Alternate
Same 8 lines, 3 crossed. The cross notes go with it so nobody's surprised.
- Crosses approved
- Released to the customer, Oct 16
Preliminary quote, Oct 16Alternate comparison
5 Portal
The customer follows it from here.
- Oct 14Plans received. Job set up from the bid invite.
- Oct 15Takeoff reviewed. One count flagged and settled with the engineer.
- Oct 16Quote sent. As specified and alternate.
- Oct 22Awarded. Alternate accepted on types A and B.
- Nov 3Submittals sent. Waiting on the engineer's review.
- NextOrder release. Lead times confirmed line by line.
See a full sample portal →
An account's standards, approved fixtures, submittals and every project, at one private link.