Bobert · Lighting intelligence

Plans in. Preliminary quote out.

Bobert reads the drawings, counts the fixtures and is built to put a reviewed lighting number in front of the GC by the next day. Every count shows where it came from.

Built for next-day quotes. A person signs off before anything goes out.

Takeoff · Sample projectSample data
A2x4 LED troffer48DWG
B4 ft LED strip12Vector PDF
C4 in downlight22Circuit math
EMEmergency unit9Not counted
4 types · 91 fixturesReview: pending
Why the number holds up

Every count shows its source.

Bobert counts the best way the drawings allow, and says which way it used.

1

DWG files

Fixture blocks counted on the lighting layer. The most exact count there is, which is why every bid asks for the DWG.

2

Vector PDFs

Type tags read and counted straight off the lighting plans.

3

Scanned sheets

Circuit watts divided by fixture watts, room by room, from the panel and circuiting schedules.

  • Estimates are marked. A count that nobody has signed off reads “preliminary” and says where the number came from. A type nobody counted shows no number at all.
  • A person signs off. Nothing goes to a customer until it’s reviewed.
  • No new format to learn. The quote lands in the proposal workbook the quotes team already uses.
  • Real information only. If Bobert can’t back it up, it doesn’t show it.
Smarter every job

The tenth quote is faster than the first.

Every finished job adds to what Bobert knows, so the next plan set starts further along.

CrossingsSpecified fixture to proven alternates, field by field
Approved alternatesWhat each account has already signed off on
Vendor picksPreferred vendors first, the full bank behind them
Pricing history NextSuggested from past quotes, never auto-filled
Built on real jobs

Real plan sets. Real quotes. Not demos.

Customer names stay private. Here is what each job proved.

Auto dealership · Ohio

30+ fixture types crossed to alternates, checked against a drawing-truth takeoff.

Quick-service restaurant · Texas

A 21-line fixture BOM pulled from the plans into a preliminary quote.

Kids’ fitness center · Indiana

Scanned plans only. Counts from circuit math, built into a 15-line preliminary quote.

Fitness studio · Missouri

Fixture schedule and cut sheets assembled into a preliminary quote.

Portals

Your program, in one place.

Standards, approved fixtures, submittals and project status for each account, at one private link. Set up by request for a one-time fee, with an NDA if the account wants one.

Northfield Development GroupNational lighting program · Sample
Sample
Approved fixture types8
Submittals approved5 of 6
Active projects3